Nuracom Installation Guide

Watch the Nuracom Autonomous Drying Rack Installation Video Tutorial for a clear, step-by-step guide to setting up your unit correctly. This video walks you through the installation process, helps you understand key mounting and spacing requirements, and makes it easier to achieve a safe, secure, and professional result at home.

Alternatively watch the video on YouTube below.

Installation Tutorial on Youtube Easy installation guide.
How it installs

From box to ceiling in under 30 minutes.

Two install paths β€” one if you've already got a ceiling outlet, one if you don't. Either way, it's a one-time job for a lifetime of better laundry.

Easy path
βœ…

You already have a ceiling outlet

30 minutes DIY-friendly $0 extra
  • Mark ceiling joist & drill 2 or 4 holes
  • Attach the bracket flush to the ceiling
  • Slide the unit into the bracket and screw in
  • Plug into the existing outlet once arms are setup, power on, install the rest. Ready to go!
Total time: 30-45 minutes β€’ Cost: $0 extra
One-time setup
⚑

You need a ceiling outlet first

30 mins extra - Hour total Electrician needed $150–$300 once
  • Sparky adds a ceiling outlet (typical 30-min job)
  • Then follow the easy-path install above
  • One-time fix β€” outlet stays for life
  • Energy savings pay it back in 5–10 weeks
Total time: 1 hour β€’ Cost: ~$200 once, then it's yours

What actually happens on install day

Five clear steps. No surprises. Most people are drying clothes within an hour of opening the box.

01
πŸ“¦

Unbox & lay out parts

5 min

Open the box and lay everything out. The unit, the bracket, the install kit, and the printed guide and/or video. No missing pieces β€” every Nuracom is QC-checked before it ships.

02
πŸ“

Find your ceiling joist

7 min

Use a stud finder to locate a structural joist (most aussie homes) or use the included template on a concrete ceiling. We give you four options for placement based on your ceiling layout. All explained in the video guide above.

03
πŸ”©

Mount the bracket

6 min

Drill 2 or 4 pilot holes, ensure the bracket is flush to the ceiling.

04
✨

Slide the unit into the bracket and install the rest

15 min

Lift the Nuracom unit into the bracket and screw it in. Test it's tight by giving it a gentle pull.

05
πŸ”Œ

Plug in & pair

7 min

Plug into the ceiling outlet, hit the power button, and download the Tuya app. Pair via Bluetooth in under 60 seconds. Run your first test cycle in under an hour!

πŸ› 

What you bring

Most homes already have all of these in the garage.

  • Cordless drill (any standard model)
  • Step ladder that can reach to your ceiling
  • Phillips-head screwdriver
  • Measuring tape
  • Stud finder
πŸ“¦

What's in the box

Every Nuracom ships with the install kit pre-packed.

  • Mounting bracket and required screws
  • Nuracom Unit
  • Scissor arms
  • Detailed printed install guide (with photos)
πŸ›‘
5-year warranty

Full structural + motor cover

πŸ“Έ
Free Indepth Video

We'll walk you through

πŸ“–
Printed guide included

Plus QR to video walkthrough

βš™οΈ
Lifetime hardware

Bracket stays for life

Still have questions? We've got you.